Title: Estimation of net benefit from the proposed Ban La hydropower project in Nghe An Province, Vietnam:Master of Environmental Management in Development planning Thesis
Authors: Nguyen, Thi Hoang Hoa
Issue Date: 2005
Publisher: University Malaysia Sarawak
Abstract: This study evaluates economic and environmental impacts of Ban La project on local communities: upstream of the Ban La dam; flooded area and irrigation areas downstream from the proposed dam. Private costs and benefits as well as public costs and benefit are estimated for the project in order to arrive at the total net social benefits. Contingent Valuation Method (CVM) is used to estimate the costs and benefits associated with intangible item or non-market goods. The study found that the net present value of social benefits at 10% discount rate and 30 years project operation period is positive (BVND 533.8). Benefit-Cost ratio is 3.18 and Internal Rate of Return (IRR) is 11%. Sensitivity analysis is also performed to detect responsiveness of the investment to changes in discount rate, changes in output of the project as well as different scenarios of project lifespan.
URI: http://tailieuso.tlu.edu.vn/handle/DHTL/8144
ISBN: 9.7890902565e+012
Appears in Collections:LVLA - Nhóm ngành Kỹ thuật Hóa - Môi trường - Công nghệ Sinh học
ABSTRACTS VIEWS

31

VIEWS & DOWNLOAD

6

Files in This Item:
Thumbnail
  • 24550.pdf
      Restricted Access
    • Size : 1,04 MB

    • Format : Adobe PDF

  • Bạn đọc là cán bộ, giáo viên, sinh viên của Trường Đại học Thuỷ Lợi cần đăng nhập để Xem trực tuyến/Tải về



    Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.