Item Infomation

Full metadata record
DC FieldValueLanguage
dc.contributor.authorKhu, Soon-Thiamvi
dc.contributor.otherWang, Xuvi
dc.contributor.otherTan, Qiaofengvi
dc.date.accessioned2020-08-24T08:17:43Z-
dc.date.available2020-08-24T08:17:43Z-
dc.date.issued2017-
dc.identifier.issn1388-3445vi
dc.identifier.urihttp://tailieuso.tlu.edu.vn/handle/DHTL/9337-
dc.description.abstractThe water-supply system of Li River in Guangxi Province, China, was selected for the case study. The results show that the operating policy proposed in this study is better than conventional operating rules and aggregated standard operating policy (SOP) for both water supply and hydropower generation due to the use of hedging mechanisms and effective coordination among multiple objectives.vi
dc.languageen_USvi
dc.publisherIAHRvi
dc.relation.ispartofseriesHydrolink, Number 4/2017, pp 105-107vi
dc.subjectwater-supply systemvi
dc.subjectLi Rivervi
dc.subjectoperating rulesvi
dc.subjectmulti-purposevi
dc.subjectmulti-reservoirvi
dc.subject.ddc628.1vi
dc.titleDerivation of optimal joint operating rules for multi-purpose multi-reservoir water-supply by systemsvi
dc.typeBBvi
Appears in Collections:Tài liệu mở

Files in This Item:
Thumbnail
  • D9337.pdf
      Restricted Access
    • Size : 817,02 kB

    • Format : Adobe PDF

  • Bạn đọc là cán bộ, giáo viên, sinh viên của Trường Đại học Thuỷ Lợi cần đăng nhập để Xem trực tuyến/Tải về



    Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.